A high qualified staff with over 15 years of experience in supervision and inspection of expansion joints field.
Our high degree of specialization allows us to provide the best knowledge and experience managing designs´ approvals, installation and use of any type of expansion joint.
According to previous studies over 7% of the total cost of a project comes from the design stages. Those costs can be reduced to values close to 1% just making an early detection of those errors. So it will suppose a great saving just working together with experts or consultants in that field during the first phases of the project development.

ITS brings experience and knowledge in the following areas

SCOPE


Supporting the design phases

During the ducts and distribution of expansion joints design phases in order to absorb stresses and loads, many errors usually occur due to the lack of knowledge. Those errors normally cause costly revisions and considerable waste of work time.

It is possible to achieve significant savings in engineering time and to eliminate undesirable costs of reviewing drawings with our highly qualified technical department previous support.

Assemblies supervision

The expansion joints are flexible pieces and they are installed in the final stages of the project, being forced during assembly in order to absorb structure or design deviations. This causes the parts to be fitted in a position preload for which they are not designed, causing premature failures or very low useful life.
An incorrectly installed expansion joint is a potential point of failure, which will cause an undesirable and costly facility shutdown. Through an inspection program performed by our technicians, you can verify that the expansion joint has been installed exactly as per design given or the deviation is acceptable for the assembly or not. Then, form ITS we will propose solutions to those non assumable deviations.

Facilities inspections

Our technicians move to facilities in order to inspect and verify that, depending on the current needs of the installation, the expansion joints have been properly designed; assembled and their operating lifeis complying with the security range of time.
In order to our customers will be able to prepare and manage their budgets reasonably, our team will prepare pieces status reports, providing them information about timing and pieces lifecycle, giving them enough information to improve their inversion forecast.

Preventive maintenance

According to the state of the expansion joints installed and depending on their work- cycles, our technicians will prepare preventive maintenance programs focused on defining a replacement schedule. On these programs ITS will includea report /forecast of investment trying to help operators to perform their annual budgets, minimizing unplanned downtime due to breakage of equipment.

ACTIVITIES

OUR ACTIVITIES

ABOUT US

More than 15 years from experience


Our high degree of specialization allows us to be the team with the most knowledge and experience in carrying out design, assembly and use verifications of any type of expansion joint

According to studies carried out on errors in design represent more than 7% of the total cost of a capital goods implementation project, making an early detection of these errors, these costs can be reduced to values ​​close to 1%. This means great savings with the simple task of having external experts to serve as consultants at specific stages of project development.


BUSINESS UNITS